Casagrande is proud to contribute to the construction of this panoramic cycle path in Malcesine!
Sefi’s Casagrande C6T XP-2 is being used by FEA to drill the tunnel that will make this unique route possible, designed to enhance the area and offer an unforgettable cycling experience.
The machine is performing fore poling drillings with a 9-hole arch with 9-metre advancements.
With its combination of power, reliability, and flexibility, the C6T XP-2 is the perfect piece of equipment for this ambitious project on Lake Garda.