At the Fornovo di Taro job site, a Casagrande C20 is working in bored pile configuration for the execution of Ø600 mm piles reaching a depth of 15 m.

The project takes place in a compact working area, close to existing structures and excavation fronts. In this context, the C20 supports the foundation works with a setup designed for rotary drilling operations where control, stability and accurate positioning are essential.

Thank you to Calzolari Perforazioni for choosing Casagrande equipment for this project.