At the Cortina New City Hub site — developed on the former railway station area for the upcoming Milano-Cortina 2026 Olympics — our KHD25 hydraulic grab mounted on a B300 XP-2 is used for diaphragm wall excavation with:
🔹 Wall thickness: 809 ÷ 1,000 mm
🔹 Depth: up to 20 m

Alongside this high-performance rig, the site features historic Casagrande machines — the B195 XP, C600 HD, and a KRC2 on C600 — proving the lasting reliability and versatility of our equipment over generations.
A special thanks to Palingeo, our valued customer on this strategic infrastructure project, for once again choosing Casagrande.

🔗 Learn more about the KHD B300 XP-2:
casagrandegroup.com/equipment/khdb300xp2/