Casagrande C6 XP-2 in Micropile Configuration for HumeLink East Foundation Trials
Casagrande C6XP-2 for HumeLink East, New South Wales (Australia)
At the Bannaby Substation in New South Wales, the Casagrande C6XP-2 was used in micropile configuration for foundation trials related to the HumeLink East project, one of Australia’s major energy transmission infrastructure programs.
For this application, the C6XP-2 supported drilling operations for a micropiled precast foundation system, where a precast concrete cap transfers structural loads to 150–250 mm diameter micropiles made of high-strength mono bars grouted into rock.
Thank you to Acciona for choosing Casagrande equipment for this foundation application.